Knob and Tube Wiring in Ontario: Code Status, Risks, Assessment and Replacement

Knob and tube wiring in Ontario is in an odd legal position. No one is allowed to install it any more, but a house that still has it is not automatically out of compliance. Insurers, buyers and renovation contractors each react to it in their own way, and much of the advice homeowners find online comes from other provinces or the United States. The facts here come from two places: the Electrical Safety Authority (ESA), which administers the Ontario Electrical Safety Code, and Natural Resources Canada, which publishes the federal guidance on insulating older houses. After that come the practical parts: finding the wiring, getting it assessed, replacing it in phases and what that costs.

What knob and tube is and when it went into Ontario homes

Knob and tube is the oldest kind of permanent house wiring. Modern cable bundles the conductors inside one jacket. Here, each wire runs separately. White ceramic knobs hold the conductors away from joists and studs, and ceramic tubes protect them where they pass through framing. The conductors are wrapped in a rubber-like insulation that, according to ESA, can turn brittle with age. There is no bonding conductor, which is why so many of these houses still have two-slot receptacles.

ESA dates the method to homes built from the early 1900s to the 1940s and notes that it is no longer used. So the age of the house is the first clue. In the City of Toronto, the 2021 Census ward profiles show where older housing is concentrated. Beaches-East York counts 55.3% of its 45,710 private dwellings in the "1960 or before" bracket, and University-Rosedale counts 40.1% of 53,505, compared with 29.3% for the city as a whole. That bracket runs well past the 1940s, so the figures cannot tell you how many homes still have knob and tube. What they do show is where a pre-war house is most likely to come up on a listing.

Code status: what the 2021 Ontario Electrical Safety Code changed

The 28th edition of the Ontario Electrical Safety Code, published in 2021, deleted the rules for installing knob and tube. ESA is clear that the Code is not retroactive. Dropping those rules did not order existing wiring out of Ontario homes.

ESA's Flash 25-05-FL (May 2025) sets out when concealed knob and tube may stay in service. Conductors hidden in walls and floor spaces that feed general lighting and receptacle circuits can remain in place if three conditions are met:

1. The circuit is protected by a 15 A fuse or breaker. 2. No outlets have been added that overload the circuit. 3. The conductors you can see are in sound condition.

The flash notice also covers receptacles. Where a three-prong receptacle is needed on a knob and tube circuit, only a GFCI receptacle should be used. Removing the ground pin from a plug or power bar so it fits a two-slot outlet is not permitted, and two-pin to three-pin adapters are not allowed. Keep in mind that a GFCI receptacle does not create a ground. It trips when current leaks, which is a different kind of protection.

The dangers ESA and NRCan describe

ESA takes a measured view. It calls knob and tube safe when a Licensed Electrical Contractor maintains it properly. The risks it lists come from age and from what later owners did to the system, not just from the original design.

Flash 25-05-FL names the unsafe practices, and you can check your own house against them:

- 20 A or 30 A fuses screwed in where a 15 A fuse belongs, which lets the old conductors carry more current than they were sized for; - extension cords used as permanent wiring, or cords too small for the load; - ground pins snapped off so three-prong plugs fit two-slot receptacles; - two-pin to three-pin adapters.

The other hazard is insulation touching the wires, and it matters most during energy retrofits. Natural Resources Canada's Keeping the Heat In guide warns against letting loose-fill insulation touch old knob-and-tube wiring, chimneys, combustion vents or exposed recessed light fixtures, because these create a fire risk. The original installation depended on open air around each conductor to get rid of heat. Blowing cellulose or fibreglass over a live run in the attic, or into a wall cavity, takes that air away. If an insulation upgrade is on your list, sort out the wiring first.

ESA also says conductors should be replaced wherever the exposed wiring shows mechanical damage, deterioration, poor connections, overheating or alterations made because of overloading. If you ever see smoke, sparking or flame at a fixture or outlet, get out of the house and call 911.

How to tell whether your house has it

ESA's technical podcast on the subject points out that an unfinished basement makes this easy: look up at the joists. Separate insulated conductors held on white ceramic knobs and running through white ceramic tubes are the giveaway. A few other clues you can check without opening anything:

- two-slot receptacles in the older rooms, a direct result of the missing bond wire; - a fuse panel, or 15 A circuits feeding the original part of the house; - single conductors on knobs in an accessible attic, which is also where the insulation risk is.

A finished basement or an earlier partial rewire hides a lot of the evidence. ESA points out that many owners have already replaced the exposed runs where wiring goes up the walls, so what you can see may be modern while the concealed branch circuits upstairs are still original. Confirming it usually means opening a few device boxes and looking at the conductors behind them. That is a job for a licensed contractor, not a home inspector.

Have electrical work in mind? Get a free quote.

Licensed & Insured | ECRA/ESA 7014730

Getting a proper assessment

ESA recommends having a Licensed Electrical Contractor (LEC) assess a house that has knob and tube. It stresses that this is different from a home inspection, because the assessment looks only at the electrical system. ESA also recognizes a formal Electrical System Safety Assessment, which an LEC business can carry out to review wiring and devices for hazards. ESA's own checklist for that assessment asks the contractor to record whether the wire type is copper, knob and tube or aluminum.

By the end of a good assessment, you should have answers to these five questions:

1. Which circuits are still live on knob and tube, and which have already been replaced? 2. Is each knob and tube circuit protected at 15 A? 3. Are any conductors damaged, brittle, badly spliced or showing signs of heat? 4. Has insulation been installed against any live run? 5. Which rooms will be opened anyway during planned renovations?

Check the contractor's licence before you book. ESA's Contractor Locator lets you search by name, licence number or phone, and the business may do the work only if the licence shows as valid.

Replacement process and phasing

Replacing knob and tube means rewiring the original circuits, and it seldom has to be done all at once. Owners often break it into phases that fit around their other plans:

- Phase 1, the service end: if the house still runs on fuses or an undersized panel, a new panel with breakers goes in first, so the new circuits have somewhere to land. - Phase 2, open areas: the basement and attic, where new cable can be run with little or no drywall work, and where the insulation conflict NRCan describes is most likely. - Phase 3, finished rooms: walls and ceilings are fished from above and below, and the small access holes are patched afterward. Kitchens and bathrooms due for renovation are often timed so the rewire happens while the walls are open. - Phase 4, decommissioning: every abandoned knob and tube run is disconnected at both ends so nothing old stays energized.

Each phase counts as its own piece of electrical work and gets reported to ESA. Keep the contractor's notification numbers and the ESA Certificate of Acceptance for every phase, since those papers prove which circuits have been replaced. If the panel change needs the utility to disconnect power, the new installation must pass ESA's inspection before the service is turned back on.

Knob and tube wiring replacement cost

KV Bear Electrical publishes one range for this work: full knob and tube removal in a typical Ontario home runs from $8,000 to $20,000+ (as of October 2026). The business's service page names three things that decide where a house lands in that range: the size of the home, how easy the walls and ceilings are to get at, and how much knob and tube is still in service. Houses with only partial knob and tube tend to come in at the lower end.

To compare the cost to replace knob and tube wiring from one quote to the next, make sure each covers the same scope. Look for the number of circuits being replaced, whether a panel change is included, how much drywall patching is in the price, whether old runs will be disconnected at both ends, and whether the ESA notification is part of the job. A quote that leaves any of those out only looks cheaper, because the missing work still has to be done later. Phasing spreads the spending over several projects. The total is usually lower when the phases line up with renovations you were already planning, since open walls cost less to wire than finished ones.

Permits, records and who files what

Almost all electrical work in Ontario has to be reported to ESA through a notification, also called a permit. If you hire an LEC, the contractor files it. ESA's do-it-yourself rules allow a homeowner to wire their own home only after filing the notification personally, and they bar friends, relatives and handymen from doing the work for you. ESA's bulletin on minor homeowner repairs also leaves ungrounded wiring out of its exemptions, and that covers knob and tube circuits.

Once the work passes inspection, ESA issues a Certificate of Acceptance. ESA describes it as an important document for insurance and resale and tells owners to get a copy from their contractor. Keep one for each phase.

Toronto and other municipal angles

The City of Toronto does not regulate knob and tube directly, but a few of its rules affect the work.

Electrical permits are handled separately. The City's BuildSafeTO guidance says almost all electrical work in Ontario needs an ESA permit, which is obtained separately from a City building permit. A rewire by itself goes through ESA, not the City.

Toronto Municipal Code Chapter 629 (Property Standards) requires every dwelling unit to have enough electrical outlets that extension cords are not used as a permanent wiring system. That rule bites in older houses with one outlet per room, so adding grounded circuits during a rewire helps with both safety and property standards.

For properties in Toronto's heritage conservation districts, the City says interior alterations do not need a heritage permit, so a rewire done from the inside is not held up by that process.

On reconnection, Toronto Hydro reminds customers that finished electrical work needs an ESA inspection, after which ESA authorizes Toronto Hydro to energize or re-energize the service.

Outside Toronto, the ESA rules are the same and the utility is different. In Durham communities such as Whitby, Ajax, Pickering and Clarington, Elexicon Energy handles power shut-offs for a panel change. It gives each residential customer one free service isolation every 12 months during regular business hours and charges for additional ones in that window (as of October 2026).

Insurance, briefly

ESA notes that many insurers will not provide or renew coverage on homes with knob and tube because they see it as a higher risk, and some ask for replacement first. Our separate post on knob and tube wiring insurance goes into quotes, surcharges and what to send your insurer. In short, insurers ask for the assessment report and the Certificates of Acceptance from each replacement phase. To book an assessment, or a quote on a phased rewire, call KV Bear Electrical at 905-999-5048.

Frequently Asked Questions

Does Ontario law force me to remove knob and tube wiring before I sell?

No. The Ontario Electrical Safety Code is not retroactive, so existing knob and tube can stay as long as it is fused at 15 A, is not overloaded and is in sound condition where you can see it. A buyer's insurer or lender may still push for replacement, but that is a commercial issue, not a Code requirement.

Can I swap the two-slot outlets in my old house for three-prong ones?

On knob and tube circuits, ESA Flash 25-05-FL allows only GFCI receptacles for this. A GFCI trips on leakage current but does not provide a ground, so some surge protectors and electronics that depend on a bond will not work as intended. Two-pin to three-pin adapters are not allowed.

Is it safe to blow new insulation into an attic that still has knob and tube?

Not if the insulation will touch the wiring. Natural Resources Canada advises against letting loose-fill insulation touch old knob-and-tube wiring because of the fire risk. Get the attic runs assessed, then replaced or decommissioned, before the insulation contractor shows up.

How long does a knob and tube assessment take compared with a home inspection?

It depends on the size of the house and how many circuits need tracing. An assessment by a Licensed Electrical Contractor covers only the electrical system, so it goes deeper on fewer items than a home inspection does. Expect the contractor to open the panel and some device boxes.

Does rewiring a Toronto house need a City building permit?

Not for the electrical work itself, which is permitted through ESA. The City's BuildSafeTO guidance says that is separate from a City building permit. You would need a City permit only if the project also includes work the City regulates, such as structural changes.

Published by KV Bear Electrical

KV Bear Electrical Inc. is a licensed residential electrical contractor (ECRA/ESA 7014730) based in Oshawa, Ontario. The facts here come from the official sources listed above. Have a question about your home? Call 905-999-5048.

Have a Question? Get a Free Quote

ECRA/ESA 7014730 | Licensed & Insured

Get Your Free Quote Today

Prefer to talk? Call us.

By providing your phone number, you agree to receive text messages (SMS) and email from KV Bear Electrical. You can unsubscribe at any time by replying STOP.