House Rewiring and Renovation Electrical in Scarborough
KV Bear Electrical is a licensed electrical contractor (ECRA/ESA 7014730) based in Oshawa that does residential work in Scarborough, including our home renovation electrical service for homes there.
Get a Home Renovation Electrical Quote in Scarborough
Rewiring a House in Scarborough During a Renovation
Scarborough has a lot of detached houses. The City of Toronto's 2021 profile of the Scarborough Community Council area counts 81,510 single-detached homes, and more of the district's dwellings date from 1961 to 1980 than from any other period. Open up a kitchen, finish a basement or add a second suite in one of them and the electrical system becomes part of the job. In an older house, the bigger decision is often whether to rewire while the walls are open.
Rewiring a house in Scarborough involves two separate approvals. The City of Toronto issues building permits for structural work and new units. The Electrical Safety Authority handles the electrical permit. Work out which ones your project needs and when each inspection falls, and the drywall crew won't close a wall before the electrical work has been seen.
What Scarborough Homeowners Should Know
The City of Toronto's BuildSafeTO guidance says almost all electrical work in Ontario needs an Electrical Safety Authority permit, which is obtained separately from a City building permit.
Source: BuildSafeTO: Learn About Building Permits, City of Toronto (toronto.ca)The City of Toronto's 2021 census profile for the Scarborough Community Council area counts 81,510 single-detached houses, 37.2% of its occupied private dwellings.
Source: Community Council Area Profile: Scarborough (2021 Census), City of Toronto (toronto.ca)Toronto's Zoning By-law 569-2013 allows a maximum of one secondary suite per dwelling unit, with an interior floor area of no more than 45 percent of the dwelling unit it is in; a secondary suite in the basement of a one storey detached house may occupy the whole basement.
Source: Zoning By-law 569-2013, Chapter 150.10 Secondary Suites, City of Toronto (toronto.ca)The City of Toronto's fire safety guidance for two-unit houses lists a lack of proper electrical upgrades for increased loads, and electrical upgrades not inspected and approved by ESA, among the risks in basement apartments created without City review and approval.
Source: Two-Dwelling Unit Houses (Basement Apartments), City of Toronto (toronto.ca)When work that needs a building permit starts without one, the City of Toronto charges an additional fee equal to 50 percent of the permit fees for the project (as of October 2026).
Source: Working Without a Permit, City of Toronto (toronto.ca)ESA says a homeowner can do electrical work in their own home after filing a notification with ESA, but friends, family members or neighbours cannot perform electrical work in that home.
Source: Do-It-Yourself (DIY) Electrical Work, Electrical Safety Authority (esasafe.com)ESA's rough-in inspection takes place once the branch circuit wiring and outlet boxes are installed and before any wiring is concealed by insulation, vapour barrier or drywall.
Source: What is a rough-in inspection and when does it take place?, Electrical Safety Authority (esasafe.com)Toronto Hydro's heat pump guide says some installers may need to update the electrical panel for a new heat pump, most often in larger or poorly insulated homes.
Source: Electric heat pumps guide, Toronto Hydro (torontohydro.com)
Facts checked October 13, 2026.
When a Scarborough Renovation Electrician Joins the Project
Scarborough has 81,510 single-detached houses, and more of its dwellings date from 1961 to 1980 than from any other period, so plenty of kitchens here get opened up, basements finished and second suites added. The electrical plan works best when it is settled before the framing goes up: where the panel sits and how it stays reachable, how many receptacles each wall needs, whether a bar fridge or home office gets its own circuit, and where the smoke alarms go.
A renovation electrician fits into the general contractor's schedule, with one firm rule: the drywall waits until ESA has seen the rough-in.
- 1
Layout on Paper
Panel access, receptacle counts, dedicated circuits and alarm positions are agreed before any stud is set.
- 2
Notification Filed
The ESA paperwork goes in before cable is pulled.
- 3
Rough-in and Inspection
Branch wiring and boxes go in after framing, and ESA inspects them before insulation, vapour barrier or drywall cover anything.
- 4
Return for the Finish
Once the finishes are on, we come back to connect devices and fixtures.
Rewiring a House in Scarborough: Our Prices and What You Can Verify
We publish our renovation ranges: $800 to $1,500 for a bathroom rough-in, $2,000 to $5,000 for a kitchen renovation electrical package and $3,000 to $8,000 or more for a full basement finish. A whole-house rewire is priced after we have walked through your plans and the existing wiring.
Rewiring a gutted kitchen or a whole floor costs far less than doing the same area with the finishes in place. While it is open, the aluminum or original circuits can be retired, the counter circuits a modern kitchen needs can go in, a panel that blocks the new layout can move, and cable can be run for a future EV charger or heat pump.
- Our ECRA/ESA licence, 7014730, appears on ESA's public Contractor Locator.
- Every room and circuit gets its own line on the written quote, agreed before work starts.
- We handle the ESA notification and book the inspections, so the Certificate of Acceptance comes to you when the work passes.
- Urgent jobs get priority in business hours only, which are 7am to 6pm on weekdays and 8am to 2pm on Saturdays.
Electrical Renovation in Scarborough: Reviews and Public Profiles
Each card below is a KV Bear customer review taken unedited from the company's Housecall Pro page. The business also carries a 5 out of 5 HomeStars rating (checked October 2026) and has a BBB profile in Oshawa.
“Kyle was responsive, provided a fair and honest quote, and got the job done quick. The work was exemplary. Kyle definitely gives you the sense of integrity, and that you don't have to question anything he says or does. In short, Kyle is a true pro. I wouldn't hesitate to recommend him to anyone. Call KV Bear Electrical for your electrical needs. You won't be disappointed!”
“Kyle has done a lot of electrical work at my home over the last couple of years, from upgrading my electrical panel to fixing my smart thermostats. He is friendly, highly professional, and genuinely cares about what’s best for his customers. I would recommend him to anyone looking to get electrical work done.”
“Kyle is super professional, on time, fair with pricing and keeps you informed the whole way. Highly recommend them!”
Basement Electrical in Scarborough: Finished Room or Second Suite
Finishing a basement with no structural changes and no new unit needs no City building permit, though the circuits, receptacles, lighting and bathroom fan still go through an ESA notification. A second suite is handled by the City as a building permit for an interior alteration that adds a dwelling unit to an existing detached house, semi or townhouse. Its electrical design has to serve two households, second kitchen included.
Toronto's Zoning By-law 569-2013 allows one secondary suite per dwelling unit, no larger than 45 percent of that unit's interior floor area, although a suite in the basement of a one storey detached house may take the whole basement. The City's fire safety guidance lists missing electrical upgrades for added loads, and wiring never inspected by ESA, among the risks in suites built without review.
Plain finish or second suite
A finish without structural work skips the City permit, while a suite needs one and wiring sized for two households.
Whole floor or renovated rooms
Aluminum, knob and tube or a nearly full panel favour rewiring while the walls are open, and sound copper may only need the rooms you are changing.
Existing service or Toronto Hydro upgrade
An induction range, a second laundry or a heat pump replacing a gas furnace can push the load beyond the current service.
Hired contractor or owner wiring
ESA lets a homeowner file a notification and do the work, but family members and neighbours may not.
Inspections, Fees and Load in Scarborough
Close a wall before ESA's rough-in inspection and the inspector can have it opened again. Starting permit work without a permit costs more as well: the City of Toronto adds a fee equal to 50 percent of the project's permit fees (as of October 2026), can stop the work, and may require finished work to be opened for inspection.
Renovations nearly always add load. Toronto Hydro's heat pump guide says installers may need to update the panel for a new heat pump, most often in larger or poorly insulated homes, and a load calculation at the design stage shows whether your service can carry the finished house or an upgrade request has to go to Toronto Hydro. For an electrical renovation in Scarborough, call 905-999-5048 or request a quote below.
Home Renovation Electrical in Scarborough: Common Questions
Do I need both a City permit and an ESA permit for my Scarborough renovation?
Often you do. Building permits from the City of Toronto cover structural work, new basement entrances and second suites, and almost all electrical work needs an ESA permit, filed separately. A simple basement finish with no structural changes and no new unit may need only the ESA notification.
Can a family member do the wiring in my Scarborough basement?
No. ESA says friends, family members and neighbours cannot perform electrical work in your home. Your two options are to do it yourself after filing a notification, or to hire a Licensed Electrical Contractor, who files the notification for you and arranges the inspections.
What does the City charge if Scarborough renovation work starts without a permit?
On top of the permit itself, the City of Toronto adds a work without permit fee equal to 50 percent of the permit fees for the project (as of October 2026). Work can also be stopped, and anything already finished may have to be opened up so it can be inspected.
Is it worth rewiring the whole house during a Scarborough kitchen renovation?
Sometimes. With aluminum branch wiring, knob and tube, or a panel near capacity, open walls make the work cheaper and cleaner than coming back to it later. If the existing copper wiring is sound and the panel has room, rewiring just the renovated rooms may be enough. Have it assessed before demolition and you will know which case you are in.
Guides on Home Renovation Electrical
Electrical Wire Colour Codes in Ontario Homes: What Each Colour Tells You
White usually marks the neutral, green or bare marks the bond, and the other colours carry current. Ontario's code bulletins say what each colour means and where the exceptions are. Colour is never a safety test, though.
Read the guideEV Load Management in Ontario: When an EVEMS Can Spare You a Service Upgrade
An EV energy management system can let a Level 2 charger share the electrical service you already have. How does EVEMS work, how do Ontario's code and ESA treat it, and when is a service upgrade still the better answer?
Read the guideHow to Reduce Your Electricity Bill in Ontario: Price Plans, Programs and Upgrades
An Ontario electricity bill depends on how much power you use, when you use it, and which price plan and programs apply to your account. This post covers the OEB's three price plans, the Ontario Electricity Rebate, the OESP, standby power and the upgrades that help.
Read the guideHome Renovation Electrical in Nearby Areas
Need Home Renovation Electrical in Scarborough? Call Us for a Free Quote.
Licensed & Insured | ECRA/ESA 7014730
