Electrical Panel Upgrades in Toronto
KV Bear Electrical is a licensed electrical contractor (ECRA/ESA 7014730) based in Oshawa that does residential work in Toronto, including our panel upgrade service for homes there.
Get a Panel Upgrade Quote in Toronto
Electrical Panel Upgrade Basics for Toronto Homes
In a Toronto home, a panel upgrade is rarely just a box swap. Going from 60 or 100 amps to 200 amp service usually means Toronto Hydro gets involved. The utility has to plan the bigger supply, disconnect the old service, and reconnect the new one once the Electrical Safety Authority has inspected the work. The order of those steps decides how long you're without power and how smoothly the day goes.
Every Toronto panel upgrade we quote starts with a load calculation and a close look at the panel, meter base and service entrance you have now. The scope goes into an itemized quote from there. If the utility is involved, we put together the load information Toronto Hydro asks for, file the ESA notification as the Licensed Electrical Contractor, and plan the changeover so disconnection, inspection and reconnection happen in sequence.


What Toronto Homeowners Should Know
Toronto Hydro takes residential service upgrade requests through an online form. A Toronto Hydro representative contacts the customer within 10 business days to review the project and confirm the scope of work, and the quote that follows, called an Offer to Connect, typically takes up to 60 days once all required information has been received.
Source: Service upgrade request, Toronto Hydro (torontohydro.com)Toronto Hydro's planning figures for single-family homes show an average peak demand of 11.0 kW and a maximum of 32.2 kW. The utility notes that these values do not represent the full capacity of an electrical panel or a home's total connected load.
Source: Typical residential peak demand values, Toronto Hydro (torontohydro.com)The Electrical Safety Authority explains that for service upgrades, relocations or replacements, the utility needs to disconnect the power, and the work must be inspected before power is restored.
Source: Notifications and Inspections, Electrical Safety Authority (esasafe.com)Under the City of Toronto's Home Energy Loan Program, eligible improvements in a heat-pump-only funding request are limited to heat pumps and installation costs, electrical upgrades if required, and building permits (as of October 2026).
Source: Home Energy Loan Program, City of Toronto (toronto.ca)Toronto Hydro's Conditions of Service, effective January 1, 2026, commit it to respond to a written connection request within 15 calendar days and to make an offer to connect within 60 calendar days, unless other necessary information is required.
Source: Conditions of Service, effective January 1, 2026, Toronto Hydro (torontohydro.com)
Facts checked October 13, 2026.
200 Amp Service Upgrade in Toronto: How the Request Moves
Moving a Toronto house from 60 or 100 amps to 200 amp service usually brings Toronto Hydro into the job. The utility plans the larger supply, disconnects the old service and reconnects the new one after the Electrical Safety Authority has inspected the work. The order of those steps decides how long you are without power, so the quote starts with a load calculation and a close look at the panel, meter base and service entrance you have now.
- 1
Apply online with documents
Toronto Hydro recommends attaching electrical drawings and load calculations up front, though they can also go later to the representative on your file.
- 2
Scope review
A representative contacts you within 10 business days to confirm the work, and the Conditions of Service in effect from January 1, 2026 commit the utility to answer a written connection request within 15 calendar days.
- 3
Offer to Connect
Toronto Hydro designs its side and sets out project details, timelines and financial requirements, typically within 60 days of receiving everything it needs, and residential customers pay for anything beyond the basic connection.
- 4
Ready when the utility is
We schedule our part so the panel, meter base and service entrance are ready for ESA's inspection when Toronto Hydro is ready to reconnect.
Cost to Upgrade to 200 Amp Service in Toronto, and Why KV Bear
Our published range for a residential move from 100 amps to 200 amps in Ontario is $2,500 to $5,000. What decides a Toronto home's figure is whether the service entrance and meter base need replacing and how the existing wiring looks, and any charges in Toronto Hydro's Offer to Connect are listed apart from ours.
Toronto Hydro plans around an average single-family peak demand of 11.0 kW and a maximum of 32.2 kW, and it says plainly that those figures do not describe a panel's capacity or a home's total connected load. Our calculation follows the Ontario Electrical Safety Code method for your own house, counting heating, cooking, laundry and planned additions such as a charger, a heat pump or a hot tub.
- ESA lists us as ECRA/ESA 7014730 on its public Contractor Locator, from our base in Oshawa.
- An itemized written quote keeps the electrical work on its own lines, which also helps if you apply for City financing.
- We supply the load figures for Toronto Hydro, file the ESA notification as the Licensed Electrical Contractor, label every circuit, and hand you the Certificate of Acceptance after the pass.
- During business hours, Monday to Friday 7am to 6pm and Saturday 8am to 2pm, urgent calls go to the front of the line.
Panel Upgrade Electrician in Toronto: Read the Reviews First
These reviews come straight from KV Bear's Housecall Pro page with no edits, and all three involve panels. HomeStars showed a 5 out of 5 rating for the company in October 2026, and the BBB listing is under Oshawa.
“Kyle has done a lot of electrical work at my home over the last couple of years, from upgrading my electrical panel to fixing my smart thermostats. He is friendly, highly professional, and genuinely cares about what’s best for his customers. I would recommend him to anyone looking to get electrical work done.”
“I have utilized the services of KV Bear on a number of occasions and the level of service, professionalism, and knowledge has been excellent. For my home, Kyle has installed a new circuit breaker panel, a dedicated circuit and interface for a portable generator, and a level 2 EV charging station. For each installation, the installation practices have been top notch and permits/inspections have been dealt with professionally. I would not hesitate to recommend KV Bear to anyone looking for a competent electrical contractor.”
“Kyle replaced my 100A panel with at 200A and did a great job. I would definitely use KV Bear again.”
Electrical Panel Replacement in Toronto or 200 Amp Service?
Sometimes 200 amps is the answer and sometimes it is not. A crowded or worn panel on a service that is already big enough can sometimes be replaced with no utility request at all, and a modest new load may fit once circuits are rearranged. The quote explains which route suits your home and why, so you neither pay for capacity you will not use nor skip capacity you will want soon.
Replace or upsize
A new panel on an adequate service can sometimes skip the utility request, while 200 amps covers a heat pump, charger or basement suite you know is coming.
Rearrange or add capacity
Shifting circuits can make room for one modest load, while a load the calculation cannot fit calls for the larger service.
Pay directly or use HELP
A heat-pump-only funding request under the City's Home Energy Loan Program can include required electrical upgrades along with the equipment, installation and building permits (as of October 2026).
Licensed contractor or DIY
A Toronto homeowner may wire their own house after filing with ESA, but relatives and handymen may not do it for them, and paid help needs an ECRA/ESA licence.
Changeover Day in a Toronto House
Because Toronto Hydro's process can take weeks, send the request well before you need the extra capacity, for example ahead of a heat pump, an EV charger or a basement suite. HELP eligibility rules can change, so confirm the current terms with the City before work starts.
On the day itself, the power is off while the old panel comes out and the new one is connected, and Toronto Hydro restores service only after ESA has inspected the installation. We confirm the date with you in advance. To begin with a load calculation, call 905-999-5048 or send a quote request below.
Panel Upgrade in Toronto: Common Questions
How long does Toronto Hydro take to arrange a service upgrade?
According to Toronto Hydro, a representative gets in touch within 10 business days of your request, and the Offer to Connect typically takes up to 60 days once the utility has all the required information. Site conditions and scheduling can stretch that, so send the request well before you need the new capacity.
What does it cost to upgrade a Toronto home to 200 amp service?
We publish a range of $2,500 to $5,000 for a residential upgrade from 100 to 200 amps. Whether the service entrance and meter base need replacing, and the condition of the existing wiring, decide where your home falls. Any charges in Toronto Hydro's Offer to Connect are listed separately, so nothing is buried in the total.
Does replacing an electrical panel in Toronto need an ESA permit?
Yes. A panel replacement or service upgrade is electrical work that needs an ESA notification, and we file it as the Licensed Electrical Contractor. On service work, ESA inspects the installation before Toronto Hydro puts the power back on. Once it passes, you get the ESA Certificate of Acceptance.
Can a panel upgrade be financed through the City of Toronto's HELP loan?
For heat-pump-only projects, the City says the funding request can include electrical upgrades if they're required, along with the heat pump, its installation and building permits. Eligibility rules can change. Check the details with the City before you apply.
Guides on Panel Upgrade
What Does It Cost to Upgrade an Electrical Panel in Ontario?
A line-by-line look at what drives the price of a 100 to 200 amp panel upgrade in Ontario: the published range, the ESA fee, the parts you own outside, each utility's steps and the wiring surprises behind the walls.
Read the guideCarbon Monoxide Detectors in Ontario: Where to Put Them and What the Law Requires
Ontario's carbon monoxide alarm rules changed on January 1, 2026, adding an alarm on every storey of many homes. This guide covers which homes need a CO detector, where to install it, the Building Code rules for hardwired alarms, testing and what to do if one goes off.
Read the guideCanadian Electrical Code vs Ontario Electrical Safety Code: How They Fit Together
The Canadian Electrical Code is a national CSA standard. Ontario turns it into law, with its own amendments, as the OESC. Knowing how the two relate tells you which edition applies today and what that means when you plan electrical work at home.
Read the guideNeed Panel Upgrade in Toronto? Call Us for a Free Quote.
Licensed & Insured | ECRA/ESA 7014730
