Panel Upgrade in Markham: Load Checks, Alectra and ESA
KV Bear Electrical is a licensed electrical contractor (ECRA/ESA 7014730) based in Oshawa that does residential work in Markham. Here's what our panel upgrade service looks like for a home in Markham.
Get a Panel Upgrade Quote in Markham
Most requests for a panel upgrade in Markham start with something annoying. The main breaker trips when the dryer and air conditioner run together, the panel has no empty slots, or someone wants a basement kitchen. Each one comes back to the same question: can the supply Alectra Utilities delivers carry everything the household now plugs in?
An electrical panel upgrade in Markham runs from a first load check to the moment Alectra restores power. A few City rules come into play along the way: when a building permit applies, what changes on a heritage street, and how a second unit affects the service.
What Markham Homeowners Should Know
Alectra Utilities, the distributor for Markham, takes residential service upgrade requests online through its New Connections Portal and expects the account to be in good standing. Once the new equipment is in, ESA inspects it and sends Alectra a connection authorization, and only then do Alectra crews return to re-energize the house. Appointments are booked through Alectra's New Connections line at 1-833-494-3674.
Source: Make a Service Request, Alectra Utilities (alectrautilities.com)Alectra's Conditions of Service, last revised May 22, 2024, ask anyone requesting a new or upgraded connection to complete a Service Request Form with the service and load details. Alectra owns its metering equipment and inspects and approves the metering provision before a service is energized.
Source: Conditions of Service, Alectra Utilities Corporation (alectrautilities.com)When a house is getting extra meters, for example for an apartment, Alectra's process begins with an upgrade request on the existing service, followed by a separate request for each new unit that quotes the upgrade's reference number.
Source: Make a Service Request, Alectra Utilities (alectrautilities.com)In the 2021 Census Profile for Markham, 20,570 occupied private dwellings date from 1981 to 1990, a larger group than the 17,710 counted for the two decades from 1961 to 1980, and 9,500 were completed between 2016 and 2021.
Source: Census Profile, 2021 Census of Population: Markham, City, Statistics Canada (www12.statcan.gc.ca)Markham's building permit page puts electrical projects on its list of housing work that does not call for a City building permit, and it points owners who are unsure to an Applications Administrator at 905-475-4858.
Source: Building Permit Process, City of Markham (markham.ca)The City's Secondary Suites Guide for Homeowners requires a building permit before a suite is created and asks that the electrical supply to and within the house be large enough to serve the added unit.
Source: Secondary Suites Guide for Homeowners, City of Markham (markham.ca)ESA's 2026 Wiring Fee Guide, effective July 6, 2026, lists a service change or panel change at $86 when a contractor files, subject to the $92 minimum notification fee, and at $212 for a non-contractor filing (as of October 2026).
Source: 2026 Wiring Fee Guide, Electrical Safety Authority (esasafe.com)Inside Markham's heritage conservation districts, owners and tenants need a heritage permit for non-structural changes to the outside of a building, and the City names exterior lighting, painting and replacement windows or doors among its examples.
Source: Heritage Conservation, City of Markham (markham.ca)
Facts checked October 15, 2026.
Markham Housing Eras and Their Electrical Supply
The 2021 Census shows Markham was built in waves. There are 20,570 occupied dwellings from the 1980s alone, more than the 17,710 still standing from the 1960s and 1970s combined, and another 9,500 were finished between 2016 and 2021. A house from the 1980s wave is now about forty years old. Its panel was laid out for the appliances of its day, before anyone added central air, a finished basement or a heat pump.
Age does not settle it on its own. A gas-heated 1985 house may sit comfortably on its present supply, while a much newer one with electric heat in an addition runs short. What decides it is a load calculation under the Ontario Electrical Safety Code. It totals heating, cooling, cooking, laundry, water heating and anything planned, then measures that against the main breaker and the service conductors.
If the numbers fit, the answer may be an electrical panel replacement in Markham on the same supply: more circuit spaces and modern breakers, with no bigger service. If they do not, the service itself has to grow, usually to 200 amps, and Alectra gets added to the schedule.
How Alectra Handles a Markham Service Upgrade, Step by Step
The utility side goes through Alectra's New Connections Portal. Your contractor files the request online with the service and load details that Alectra's Conditions of Service ask for, and the account at the address has to be in good standing before anything moves. Any make-ready work gets done and reported back to the New Connections team, and any Alectra charge is paid by EFT or cheque.
On changeover day, the supply is cut, the old equipment comes out, and the new panel and service entrance go in. ESA then inspects the installation. A pass sends a connection authorization to Alectra so its crews can come back and re-energize. Alectra owns the meter and approves the metering provision before energizing, so give the meter base location as much thought as the panel. Bookings go through the New Connections line at 1-833-494-3674.
The ESA notification is a separate filing with its own fee, which is listed in the facts above. ESA issues the Certificate of Acceptance to whoever filed. Ask your Licensed Electrical Contractor for a copy and keep it with any letters or emails from Alectra about the request.
Panel Upgrade in Unionville, Second Suites and City Permits
A panel upgrade in Unionville, Markham Village or Buttonville comes with a question newer subdivisions never face. All three are on the City's list of heritage conservation districts. Markham wants a heritage permit before non-structural exterior changes there, and exterior lighting is one of its named examples. If the meter base is moving to a new spot outside, or a new mast is going on a street-facing wall, talk to heritage staff before the Alectra request goes in.
Inside the house, ordinary electrical work needs no City building permit. It is filed with ESA. The exception is a project the City permits for other reasons. The Secondary Suites Guide requires a building permit before a suite is added and expects the service to be sized for the second unit, so a basement apartment can turn a simple panel swap into a full upgrade.
KV Bear Electrical's published range for a typical 100 to 200 amp panel upgrade is $2,500 to $5,000 (as of October 2026). A straight swap beside the existing meter is at the low end. A new meter base and entrance cable, a relocated panel or worn-out circuits push it up. Alectra may bill separately, although an upgrade can carry no Alectra charge when its existing infrastructure already supports the new size.
Panel Upgrade in Markham: Common Questions
Would a newer house need a panel upgrade in Cornell, Markham?
Sometimes. It depends on what has been added since the builder left, such as a basement unit, a Level 2 charger, a hot tub or electric heat in an addition. If a load calculation shows the total still fits, new circuits go into the existing panel or a subpanel. If it does not, the next step is an Alectra upgrade request.
Do I need a City of Markham building permit just to change my panel?
Not for the electrical work alone. The City lists electrical projects as housing work that needs no building permit, so the panel change is filed with ESA instead. If the upgrade is part of a bigger project the City does permit, such as a secondary suite, that building permit still applies. For an answer on a specific project, call Markham's Applications Administrator at 905-475-4858.
How long is a Markham house without power during a service changeover?
From the moment the supply is disconnected until ESA's inspection passes and Alectra re-energizes the service. The contractor schedules both around the disconnect date to keep the gap short. If you have a sump pump or a medical device that needs power, plan for it ahead of time.
Can a basement tenant in a Markham house have a separate Alectra meter?
Yes, it can be done. The owner first files an upgrade request on the existing service that mentions the planned meters. Then a separate application goes in for each new unit, quoting the upgrade's reference number. The City's suite rules apply as well, including the building permit and the requirement that the service be sized for both units. To book a load check, call 905-999-5048.
What Our Customers Are Saying
“Kyle has done a lot of electrical work at my home over the last couple of years, from upgrading my electrical panel to fixing my smart thermostats. He is friendly, highly professional, and genuinely cares about what’s best for his customers. I would recommend him to anyone looking to get electrical work done.”
“I have utilized the services of KV Bear on a number of occasions and the level of service, professionalism, and knowledge has been excellent. For my home, Kyle has installed a new circuit breaker panel, a dedicated circuit and interface for a portable generator, and a level 2 EV charging station. For each installation, the installation practices have been top notch and permits/inspections have been dealt with professionally. I would not hesitate to recommend KV Bear to anyone looking for a competent electrical contractor.”
“Kyle replaced my 100A panel with at 200A and did a great job. I would definitely use KV Bear again.”
Guides on Panel Upgrade
Common Electrical Code Violations in Ontario Homes
Ontario's electrical rules sit in a provincial regulation, and ESA enforces them. Here is how code compliance gets checked and which household problems ESA warns about. Unpermitted work is its own issue, because it can surface when a house changes hands.
Read the guideAFCI vs GFCI: What Ontario Homeowners Need to Know
A GFCI guards against shock. An AFCI guards against arcing that can start a fire. See how the two differ, where ESA says Ontario's code calls for each one, and what it means for an existing home.
Read the guideWhy You Should Only Hire an ESA-Licensed Electrician in Ontario
In Ontario, the business you hire for electrical work must hold an ECRA/ESA licence. That licence is not the same as an electrician's trade certificate. Learn what it covers, how the two differ and how to check a number before you sign.
Read the guidePanel Upgrade in Nearby Areas
Other Services in Markham
Need Panel Upgrade in Markham? Call Us for a Free Quote.
Licensed & Insured | ECRA/ESA 7014730
