Every renovation that opens a wall or frames a new room has a short window when the electrical work is easy to see and easy to change. That window is the electrical rough-in. The studs are up, the ceiling joists are bare, and the electrician runs cable and fastens boxes where outlets, switches and lights will go. Once insulation and drywall cover it, moving a single receptacle means cutting and patching.

This post explains what happens at rough-in and what waits for the finish stage, what the Electrical Safety Authority (ESA) looks at during its rough-in inspection, how the municipal building permit runs alongside the electrical notification, what a rough-in typically costs, and how to get a kitchen, bathroom or basement ready for it.

## What is rough-in electrical?

Rough-in electrical is the first of two installation stages. In the rough stage, the wiring that will end up hidden is put in place: cables from the panel to each location, outlet and switch boxes, boxes for light fixtures and fans, and the connections inside those boxes that join one cable to the next. Nothing is live in the finished sense yet, and no devices are mounted.

ESA ties the stage to a specific moment. Its rough-in inspection takes place when all branch circuit wiring and outlet boxes are installed, and before that wiring is hidden by insulation, vapour barrier or drywall. On a renovation that usually means after demolition and any new framing, and before the insulation goes in.

## Rough in electrical vs finish: what goes in at each stage

ESA's rough-in checklist is a useful description of what should be done by the end of the rough stage. Every cable is installed, strapped and supported. Every required box is in and securely fastened. Cables have their outer jacket stripped and are terminated in the boxes, bonding connections are made at each box, and any joints or splices inside the boxes are finished. Protection plates are fitted wherever a cable needs guarding against nails and screws.

The finish stage, sometimes called trim-out, comes after the walls and ceilings are closed and finished. ESA describes the installation as complete when all receptacles, switches, cover plates, light fixtures and permanently connected appliances are in place, the panel directory is filled in, and unused openings in the panel and boxes are closed with fillers. If a hardwired appliance or a light fixture has not arrived, ESA allows the cable to be capped in a box with a blank cover, or a temporary fixture to be hung, so the final inspection does not have to wait.

## Decisions to make before the rough-in

Because the boxes set the layout for good, the choices behind them need to be made early. Kitchens carry the most rules. ESA's Bulletin 26-23-6 explains that counter receptacles must be spaced so that no point along the counter wall is more than 900 mm from one. A permanently fixed island or peninsula with a continuous space of at least 600 mm by 300 mm needs at least one receptacle of its own, and receptacles may not be mounted facing up in a kitchen work surface. The code also calls for at least one branch circuit for refrigerator receptacles. The bulletin allows receptacles to face down from under the upper cabinets, provided they sit as close as practicable to the wall, which helps when the backsplash is mirror or stainless steel.

That means the cabinet drawings, the appliance list and the island size should be final before the electrician marks boxes. Adding a wall oven, a built-in microwave or a second fridge can change the circuit plan.

For basements, the City of Oshawa's renovation guide is a good example of what the building side asks for: smoke and carbon monoxide alarms in each bedroom and in each area or hallway serving bedrooms. The locations of those alarms, the lighting layout and any home office or media wall all belong on the plan before the rough-in starts.

## Have electrical work in mind? Get a free quote.

Licensed & Insured | ECRA/ESA 7014730

[Call 905-999-5048](tel:+19059995048) [Get a Free Quote](https://kvbearelectrical.ca/estimate)

## Electrical rough in inspection: what ESA checks

The electrical side starts with a notification of work, which people often call an ESA permit. ESA says almost all electrical work needs one and that it must be filed before work begins. The person doing the work files it: the homeowner if they are wiring their own home, or the Licensed Electrical Contractor they hire. ESA classes most renovation jobs as Renovation Residential, which covers any change to the original wiring, while New Residential applies to a structure that never had a wiring system.

Once the rough wiring is in, the person who filed asks ESA for an inspection date. Inspections happen between 8:00 a.m. and 4:00 p.m., Monday to Friday, excluding statutory holidays. The inspector checks the items listed above, and nothing may be concealed by insulation or by floor, wall or ceiling materials until an inspector authorizes it. On new installations, ESA usually completes the service inspection and the rough-in inspection on the same visit; otherwise additional inspection fees may apply.

Two more points are worth knowing. ESA decides which installations it inspects in person and may accept some without a site visit, so not every job sees an inspector at rough-in. And a residential notification is valid for 12 months; if no inspection takes place in that time it expires, and a new notification carries full inspection fees.

## The rough in inspection and the building permit

ESA is clear that an electrical notification is not a building permit, and that a project may need both. The province's guide to building permits says you must get one before you make renovations or repairs or add to a building, and the City of Oshawa lists finishing a basement and making alterations among the projects that require one. Oshawa's basement guide exempts only a few small jobs, such as new floor finishes, cabinets with no plumbing changes and a window replaced within its existing rough opening. Rules vary by municipality, so check with your own building department.

The building permit brings its own inspections. Under the Building Code the permit holder must tell the municipality when work reaches each required stage, and the building official must inspect within two working days of being notified. For a house, the prescribed stages in Article 1.3.5.1 include substantial completion of structural framing and of the ductwork and piping for heating and air conditioning, and substantial completion of insulation and vapour barriers.

This is where scheduling matters. ESA will not let wiring disappear behind insulation before its rough-in inspection is passed, and the building inspector needs to see the insulation and vapour barrier before drywall. In practice, the order on a typical renovation runs framing, then electrical, plumbing and duct rough-ins, then the ESA rough-in inspection and the building framing inspection, then insulation and its inspection, and finally drywall. The province also asks permit holders to post the permit where it can be seen and keep a copy of the plans on site.

## Final inspection and the Certificate of Acceptance

ESA asks for the final inspection to be requested as soon as possible once the electrical installation is complete. When the work is reviewed and passed, ESA issues an ESA Certificate of Acceptance to whoever filed the notification. ESA describes the certificate as proof that the work meets the Ontario Electrical Safety Code and an important document for insurance and resale. If a contractor filed, ask for a copy for your records.

Keep that certificate with the building permit records. A future buyer or an insurer may ask whether the renovation was permitted and inspected, and the two documents together answer both halves of the question.

## What an electrical rough-in costs

The cost depends on the scope of the renovation. As of November 2026, KV Bear Electrical's published ranges are $800 to $1,500 for a bathroom rough-in, $2,000 to $5,000 for a kitchen renovation electrical package, and $3,000 to $8,000 or more for a full basement finish. Each job is quoted in writing with the items listed, once the plans have been reviewed.

Whether the existing panel has room for the new circuits is part of the quote; a bathroom seldom changes that answer, but a whole kitchen or basement can. For homeowners who file their own notification, ESA notes that fees vary with the complexity of the work but can be less than $100 for many small residential projects.

## How to prepare for an electrical rough-in

Finish the design first. Cabinet drawings, appliance model numbers, fixture choices and furniture placement decide where boxes go. A walk-through with the electrician after framing, marking each box location on the studs, catches problems while they cost nothing to fix.

Tell your contractor and the insulation installer not to close any wall or ceiling until the ESA rough-in is passed and the building inspector has seen the framing. Photograph every open wall before insulation goes in, with a tape measure in the frame, so you can find cables and boxes later. Keep the permit posted and the approved plans on site for the building inspector.

Remember who may do the work. ESA allows homeowners to wire their own home after filing a notification, but friends, family members and neighbours cannot do it for them, and handymen and other service providers cannot do electrical work unless they hold an ECRA/ESA licence. KV Bear Electrical (ECRA/ESA 7014730) does rough-ins for kitchens, bathrooms and basements, files the ESA notification, books the inspections and passes along the Certificate of Acceptance. To plan yours, call [905-999-5048](tel:+19059995048) or request a quote.

## Frequently Asked Questions

What does an electrical rough-in include?

The hidden part of the wiring: cables run from the panel and strapped to the framing, boxes for every outlet, switch and light, bonding and splices completed inside the boxes, and protection plates where cables need guarding from nails and screws. Devices, cover plates and fixtures come later, at the finish stage.

Can insulation go in before the electrical rough-in inspection?

No. ESA says no wiring may be concealed by insulation or by floor, wall or ceiling materials until an inspector authorizes it. Book the ESA rough-in inspection before the insulation crew arrives.

Does a renovation need both an ESA notification and a building permit?

Often, yes. ESA states that an electrical notification is not the same as a building permit and that you may need both. Ontario's building permit guide says a permit is needed to renovate, and municipalities such as Oshawa require one for basement finishing and alterations.

How long does an ESA notification for a renovation stay valid?

Twelve months for residential work. ESA says the notification expires if no inspection takes place in that time, and that resubmitting a new notification means paying full inspection fees again.

Who books the rough-in inspection with ESA?

Whoever filed the notification of work. If a Licensed Electrical Contractor filed it, the contractor books the inspection; a homeowner doing their own wiring books it themselves.

## Sources

1. [Electrical Safety Authority: What is a rough-in inspection and when does it take place?](https://esasafe.com/notifications-and-inspections/what-is-a-rough-in-inspection/)
2. [Electrical Safety Authority: Notifications and inspections](https://esasafe.com/notifications-and-inspections/)
3. [Electrical Safety Authority: What is a final inspection and when does it take place?](https://esasafe.com/notifications-and-inspections/what-is-a-final-inspection/)
4. [Electrical Safety Authority: Preparing for your inspection](https://esasafe.com/compliance/preparing-for-your-inspection/)
5. [Electrical Safety Authority: DIY electrical work](https://esasafe.com/compliance/diy-electrical-work/)
6. [Electrical Safety Authority: Certificate of Acceptance](https://esasafe.com/compliance/certificate-of-acceptance/)
7. [ESA OESC Bulletin 26-23-6: Receptacle requirements in kitchens of dwelling units](https://esasafe.com/assets/files/esasafe/pdf/Electrical_Safety_Products/Flash_Notices/26-23-6.pdf)
8. [Government of Ontario: Building permits (Citizen's guide to land use planning)](https://www.ontario.ca/document/citizens-guide-land-use-planning/building-permits)
9. [Government of Ontario: 2024 Building Code Compendium, Part 1](https://www.ontario.ca/document/2024-building-code-compendium/part-1-general-0)
10. [City of Oshawa: Building permits](https://www.oshawa.ca/living-here/building-and-renovating/building-permits/)
11. [City of Oshawa: Basement renovation guide](https://www.oshawa.ca/media/fzhn4101/basement-renovation-guide.pdf)

Facts checked November 26, 2026.

Published by KV Bear Electrical

KV Bear Electrical Inc. is a licensed residential electrical contractor (ECRA/ESA 7014730) based in Oshawa, Ontario. The facts here come from the official sources listed above. Have a question about your home? [Call 905-999-5048](tel:+19059995048) .

[Verify our licence with ESA](https://licensing.esasafe.com/contractor-locator-tool/) [Get a Free Quote →](https://kvbearelectrical.ca/contact)

### Related Services:

[Home Renovation Electrical](https://kvbearelectrical.ca/services/home-renovation-electrical) [Electrical Inspection](https://kvbearelectrical.ca/services/electrical-inspection)

## Related Guides

[Electrical Safety ### Outlet Not Working? What to Check Before You Call A dead outlet may have nothing wrong with it. The cause can be a GFCI reset button in another room, a wall switch, or a breaker that tripped without looking tripped. Check those three first, and call an electrician if the outlet is still dead. Read the guide](https://kvbearelectrical.ca/blog/outlet-not-working) [Electrical Safety ### Hardwired Smoke Detector: Why It Chirps, Beeps or Shows a Red Light A hardwired smoke detector still has a backup battery, which is why it can chirp. This post explains what the chirps and red lights usually mean, what Ontario's Building Code expects from wired and interconnected alarms, and when replacing one counts as electrical work. Read the guide](https://kvbearelectrical.ca/blog/hardwired-smoke-detector) [Wiring & Rewiring ### Aluminum Wiring in Ontario: Years, Warning Signs, Insurance and ESA Repair Rules When did aluminum branch wiring go into Ontario homes, and why does trouble show up at the connections? Then come what insurers ask for, the device and connector markings ESA Flash 25-18-FL requires, and the paperwork that settles insurance and resale questions. Read the guide](https://kvbearelectrical.ca/guides/aluminum-wiring-ontario)

### Local Service Pages:

[Electrical Inspection in Toronto](https://kvbearelectrical.ca/electricians-in-toronto/electrical-inspection) [Home Renovation Electrical in Toronto](https://kvbearelectrical.ca/electricians-in-toronto/home-renovation-electrical) [Home Renovation Electrical in Whitby](https://kvbearelectrical.ca/electricians-in-whitby/home-renovation-electrical)

### We Serve These Areas:

[Electrician in Whitby](https://kvbearelectrical.ca/electrician-in-whitby-durham-region) [Electrician in Oshawa](https://kvbearelectrical.ca/electrician-in-oshawa-durham-region) [Electrician in Pickering](https://kvbearelectrical.ca/electricians-in-pickering) [Electrician in Toronto](https://kvbearelectrical.ca/electricians-in-toronto)

## Disclaimer

The content of this article is provided by KV Bear Electrical Inc. (“KV Bear Electrical”) for general informational purposes only. It does not constitute professional electrical, engineering, legal, insurance or other professional advice, and it is not a substitute for an on-site assessment of your property by a qualified professional. Reading this article, or contacting KV Bear Electrical about it, does not create a contractor, advisory or other professional relationship.

Electrical work is inherently dangerous and can result in electric shock, fire, property damage, serious bodily injury or death. Before undertaking, attempting or relying on any information in this article for any electrical work, you must consult a Licensed Electrical Contractor holding a valid ECRA/ESA licence. In Ontario, electrical work must comply with the Ontario Electrical Safety Code, and homeowners who choose to perform work in their own home must first file a notification with the Electrical Safety Authority (ESA) and have the work reviewed by the ESA. Always follow applicable codes, permit requirements, manufacturer instructions and the directions of the ESA and your local electricity distributor.

While KV Bear Electrical makes reasonable efforts to keep its articles accurate and current, codes, regulations, programs, fees and product information change, and conditions in every home differ. The information in this article is provided “as is” and without any representation, warranty or guarantee of any kind, express or implied, including as to its accuracy, completeness, currency or fitness for a particular purpose. Links to third-party websites are provided for convenience only; KV Bear Electrical does not control or endorse their content and is not responsible for it.

Any action you take, or decide not to take, based on this article is strictly at your own risk. To the fullest extent permitted by applicable law, including the laws of the Province of Ontario, KV Bear Electrical Inc. and its owners, employees and agents shall not be liable for any loss, damage, injury or death of any kind, whether direct, indirect, incidental, special or consequential, arising out of or in connection with the use of, or reliance on, this article or any information in it, including any electrical work performed by you or by anyone other than KV Bear Electrical under a written agreement with you.

If you believe there is an immediate electrical hazard, such as sparking, burning smells, smoke or a downed power line, keep away from it and call 911 and your local electricity distributor right away.

## Have a Question? Get a Free Quote

ECRA/ESA 7014730 | Licensed & Insured

### Get Your Free Quote Today